Silverwoods Nursing Home Development
Works Description: |
Earthworks, Foundations, Liftshafts. Demolition, Blockwork, Drainage, Reinforced Concrete Floor Slab, Access Roads |
Duration: |
12 Weeks |
Contract Value: |
£150,000 > £200,000 |
Client: |
Trinity Developments South Limited |
Silverwoods in Thorrington, Colchester is a private development of a new 3 storey , 72 bedroom care home. DB Construction were contracted to carry out all sub-structure & groundwork’s to bring the development to floor slab level.
The site was formally a holiday camp with the footprint of the new build situated on a steep gradient. Over 500 tonne of material was excavated from the southern side of the site and transferred to the northern side to make up the levels and allow commencement of the foundations.
Conventional reinforced strip foundations, blockwork, Type 2 fill & over 80 independent soil stacks & pipe lines were constructed before a reinforced concrete slab was cast covering over 18,000 square ft.
Our Accreditations

We are fully accredited to illustrate our commitment to the construction industry, quality assurance, safety & health standards and environmental awareness. More…
J's Hospice

The J's Hospice is an incredible charity which DB Construction have made a company long pledge to support. Find out More....
KPI's

Having delivered hundreds of diverse schemes in 2010-2011 we measured the quality of delivery for every project and are proud of our performance. See how we scored for yourself. More…
Carbon Neutral

As a sign of our commitment to the environment DB Construction in conjunction with Carbon Earth will be presenting each of our clients who would like them with tree planting certificates, on successful project completion. The certificate shows exactly how DB Construction has off set the carbon emissions generated on the project on behalf of our client, including what type of trees have been planted and their exact GPS location. More......